Run status
Status describes where the run is in its lifecycle. A run has one of these statuses:completed and cancelled are terminal statuses. A terminal run can have
completed results and, where applicable, a final outcome.
Schedules with no fixed time keep their checks spread across the day (or their
longer interval). Before the first target starts, the run stays queued and
shows First check in. Elapsed time starts with the first target, not when
the schedule creates the run. Duration excludes that initial wait but includes
gaps between targets. No fixed time remains visible when editing a schedule;
saving other settings does not assign it a fixed hour.
Outcomes
Outcome answers a different question from status: what happened across all of a run’s targets. It is set when the run reaches its terminal state.
For example, a run that has both completed and failed targets is
partial, not
failed. Cancelled targets do not prevent the remaining completed targets from
producing succeeded.
Target status
Each target in a run has its own status. Target status is one ofqueued,
running, completed, failed, deferred, cancelled, skipped, or
blocked. Use it to see which target needs attention without losing the
overall run result.
Not confirmed
Not confirmed is a special display label for a blocked target whose send
could not be confirmed. It is not a failure. It is not counted as spend, and it
is not retried automatically because the check might already have been sent.
Run the target again if you need a fresh result.
A run containing a Not confirmed target can never finish with succeeded: the
target remains unfinished for outcome calculation.
Planned runs
The Planned view shows future schedule occurrences before they start. From there you can choose Run now to start that one occurrence immediately, or Skip once to cancel that one planned occurrence. These controls do not change the schedule itself. To change future cadence or membership, edit the schedule. When a completed run ispartial, you can retry its failed or deferred targets